License No. 2314 Granted To a Tourism Company
To Authorize The Practice of all Tourism Activities According
To The Provisions of Paragraph (A) of Article (2) Of law No.38 of 1977
and its amendments and executive Regulations governing The Law

Follow Us
GO UP
Image Alt

The High Dam

The High Dam

Construction of the dam began in 1960, was completed in 1968, and the dam was officially opened in 1971.

  • The High Dam length at the top is 3830 metres, of which 520 meters are between the two banks of the Nile and the rest extends in the form of two wings on both sides of the river. The height of the dam is 111 meters above the level of the bottom of the Nile River and its width at the top is 40 meters

Good to Know

Country
Egypt, Aswan
Founded in
1960
Languages spoken
Arabic - English